Skip to content

Pultrusion machine · Double-station configuration

Double-station hydraulic pultrusion machine

Henan Zhongsheng lists a double-station hydraulic pultrusion machine with independently controlled stations. Use separate profile drawings and process requirements for each path. The published ratings below describe the catalogue configuration; they do not establish achievable output for an untested resin and die.

Download product & RFQ brief (.txt)

Configuration brief

Start with the product you need to make.

  1. Treat each path separately

    Provide resin, die and product requirements for both stations. Check whether the planned materials can share the same operating area.

  2. Plan the full footprint

    The main-machine dimensions exclude the creel. Request a layout including feed, saws, finished-part handling and access.

Review the configuration with engineering before the quotation is finalized.

Choose the configuration

What to resolve before selecting this line

Treat each path separately

Provide resin, die and product requirements for both stations. Check whether the planned materials can share the same operating area.

Plan the full footprint

The main-machine dimensions exclude the creel. Request a layout including feed, saws, finished-part handling and access.

Specification

Configuration table

Published catalogue values are reference figures; the agreed configuration and acceptance criteria belong in the quotation. Unconfirmed values are marked TBD · ask factory.

Double-station hydraulic pultrusion machine specification
ParameterDouble-station configuration
Maximum pull force per station100 kN
Pull speed range0.1–1.5 m/min
Maximum profile width × height200 × 100 mm
Clamping clearance400 × 200 mm
Adjustable die table length430–1,030 mm
Heating zones8 × 2
Main machine dimensionsExcludes creel framework11,000 × 1,460 × 2,200 mm
Total connected powerPage states 24 kW total but 50 kW heating; request a reconciled load listTBD · ask factory
Supply voltage380 V 50 Hz
Lead time (working days)TBD · ask factory

Reference: Henan Zhongsheng — double-station hydraulic pultrusion machine. Henan Zhongsheng manufacturer catalogue, checked 2026-10-21. Published data requires confirmation in the project specification. Reviewed .

Production workflow

Review the line, stage by stage

Use these stages to define responsibilities, interfaces and the evidence needed at handover.

  1. 01

    Prepare two feeds

    Agree the reinforcement and resin arrangement serving each station.

  2. 02

    Set the dies

    Review tooling clearance and the heating recipe for each section.

  3. 03

    Coordinate production

    Define how each station starts, stops and transfers parts to downstream handling.

Scope of supply

Define the supply package and its options

Request an itemized quotation against these lists. A catalogue description does not confirm that every item is included.

Core equipment and work to specify

  • Scope to agree: both pulling stations and controls
  • Die supports and heating arrangement for each path
  • Cut-off interfaces, guards and documentation
  • Trial plan covering both stations

Options and services to price separately

  • Dies, gripping inserts and preformers for each profile
  • Creels and resin equipment for the proposed layout
  • Electrical adaptation, commissioning and training
  • Wear spares, packing and freight

Applications

Applications to discuss with engineering

  • Concurrent profile production projects
  • Product mixes requiring separate station settings

Prepare your enquiry

Send a brief that can be quoted

Include the drawings and requirements below so engineering can confirm the configuration, exclusions and lead time.

Include in your RFQ

  • Drawing and material specification for each station
  • Required speed and production schedule per profile
  • Cut lengths and downstream handling
  • Whether stations must stop and change over independently
  • Full site layout and available utility capacity

Agree the acceptance evidence

  • Run the agreed profiles on both stations during FAT
  • Demonstrate independent setting changes and stopping behavior
  • Inspect grip marks, dimensions and cut lengths
  • Reconcile measured electrical demand with the approved load list

Commercial terms

Who you contract with

Manufacturer
Henan Zhongsheng Composite Material Co., Ltd.
Warranty party and term
Henan Zhongsheng Composite Material Co., Ltd.; term and coverage confirmed in the written quotation.
Contracting party and exporter of record
pultrx, Shanghai, China
Incoterms
FOB Chinese port by default; CIF/DAP on request
Payment
Agree milestones for drawing approval, contracted trial or FAT acceptance and shipment. Exact split on the quotation.
Third-party inspection
SGS, BV or TÜV pre-shipment inspection accepted, cost borne by the buyer
Electrical and controls
State the plant voltage and frequency, including 380 V 50 Hz or 480 V 60 Hz. Agree the panel standard, guarding and destination conformity documentation in the quotation; certification is not implied.
Lead time and spare parts
Confirm working days from drawing and specification approval, plus the recommended wear-parts list, unit prices and availability.

FAQ

Questions buyers ask

Does two stations mean twice the output?
Do not assume that. Compare accepted production for both proposed profiles, including feed preparation, changeover and downstream handling.
Can different profiles run together?
The manufacturer describes independent station control. Ask it to demonstrate your specific pairing and confirm any shared utilities or stopping dependencies.
Why is connected power TBD?
The published total is lower than the stated heating load. Electrical sizing needs a corrected load list from the manufacturer.

Send a cross-section drawing. Get a scoped quotation.

Every quotation names the manufacturer, the exporter of record and the warranty party, and lists what is included.